Print

The Aquatic Center Essen-Rüttenscheid was built 1975.

The water surface is divided into two pool halls:

 

Public traffic (Bus):

Line
Type
Stop
145*
BUS
Paulinenstrasse
146*
BUS
Paulinenstrasse
160
BUS
Paulinenstrasse
161
BUS
Paulinenstrasse

* from/via Essen-Hbf.